Dry Ice Blasting of Convection Coils at FFC Mirpur Mathelo – Nov 2020
Dry Ice Blasting of Primary Convection Coils F-201 externally at Fauji Fertilizer Company Limited, Mirpur Mathelo. E-205 A / B…
TALK WITH US!
+92 51 4499251
Dry Ice Blasting of Primary Convection Coils F-201 externally at Fauji Fertilizer Company Limited, Mirpur Mathelo. E-205 A / B…
Retubing of (07) Heat Exchangers and (04) Fin Fan Coolers at KAR-3 Refinery, Erbil, Iraq. AE-101 A,B,C,D Fin Fan Cooler…
Dry Ice Blasting of HRSG Economizer 1 at Engro Powergen Qadirpur in September 2018
Early Production Facility PLANT: Hydrocarbon Sludge cleaning of High Pressure, Medium Pressure, Low Pressure Separators and (LPW) Separator. Plant-1: Cleaning…
Replacement of Chiller Condenser Tubes at K-Electric, job includes removal of existing tubes, installation and expansion on new tubes along…
Shell Side Chemical Cleaning of E-605 De-Ethanizer Reboiler and Hydro Jetting of Tube Bundle at POL Pindori Plant.
Chemical Cleaning of (01) Regenerator Condenser E114 & (01) Leam Amine Trim Cooler E113 at OGDCL UCH-II Gas Field, Balochistan
Dry Ice (CO2) Blast Cleaning of Convection Coils of Primary Reformer Surface Blasting at Pak Arab Fertilizer, Multan
Dry Ice (CO2) Blast Cleaning of 18 MW Generator Stator for Fauji Fertilizer Company Limited at FFC Goth Machi.
Dry Ice (CO2) Blast Cleaning of 7.45 MW GE Frame III Gas Turbine Stator and Rotor for Pakistan Petroleum Limited…
Hydro Jetting/Hydro Lancing of Tube Bundles, Crude Oil Storage Tanks, Vessels, Crude Heat Exchanger, Low & High Temperature Separator /…
Dry Ice Blasting of Amnonia Plant Primary Reformer F-101 Convection Section Coils Exterior Surface (18 to 26 Row Only) at…
Dry Ice (CO2) Blast Cleaning of Convection Coils of Primary Reformer Surface Blasting at Fatimafert (formerly Dawood Hercules), Lahore
Re-tubing of Chiller at UNISA Pharmaceutical Industries Limited, Akora Khattak, Nowshera.
Chemical Cleaning of Main Condenser Tubes at 450 MW Rousch Power Plant, Abdul Hakim.
Internal Tube & Shell Side Chemical Cleaning of Heat Exchanger E-601 NII & E-601 RII and Hydro Jetting of Tube…
Provided Service for Dry Ice Blast Cleaning of 64.5MVA GT-03 Generator, 248MW KPC. Scope of work: – The job includes…
Provided Service for Dry Ice Blast Cleaning of 64.5MVA GT-04 Generator, 248MW KPC. Scope of work: – The job includes…
Internal & External Chemical Cleaning of (01) Heat Exchanger E-604 & External Chemical Cleaning of (01) Solvent Oil Column Reboiler…
Hydro Jetting / Lancing for Tube Cleaning of Vertical Heat Exchanger 6-17-2105, 2106 & 2102A/B installed in CN Area at…
Chemical Cleaning & Hydro Jetting of E-100 at Chanda Oil Field OGDCL – May 2016
Poly Dart Shooting of Main Condenser at Uch Power Plant – OCT 2014
Chemical Cleaning & Hydro Jetting of Heat Exchanger of Chanda Oil Field OGDCL at MES Premises – MARCH 2015.
Dry Ice Blasting of Generators at Kohinoor Energy – Aug 2006.
Dry Ice Blasting of Fin Fan Cooler at KESC Karachi – Feb 2015
Tube Expansion of Fin Fan Cooler at Dewan Petroleum. – MARCH 2015
Chemical Cleaning of Heat Exchanger at Nimir Chemicals Pvt Ltd. – MARCH 2016
Chemical Cleaning of Heat Exchangers and Re-Boilers at Nimir Chemicals Pvt Ltd. – AUG 2015
Chemical Cleaning & Hydro Jetting of Heat Exchangers of OGDCL RIG-N1 at our MES Premises – Oct 2014.